Almost a roof...


Finished the framing & rafters for the loft and laid the ship-lapped flooring down so I could start on working on the roof rafters.



Putting the rafters over the loft was easy. Toe nailed the front rafter and then the back rafter. Put the ridge board up and only nailed it once on each rafter.



Put the second set of rafters up and nailed in place. I did make a mistake and nailed the wrong front rafter in place. Stepped back to take a look and saw my error. I guess the mind goes when you are baking in the sun.



CORRECT rafters installed and started working on the beams for the porch



Installed some of the front siding and installed the windows temporarily to get them out of the way.



Inside view looking up to the loft.



Starting to cover the cabin.



Took about two hours of fighting the tarps in the wind to enclose the structure. Forecasting rain for the next few days.

Sunday, August 10, 2008

Not feeling well...


Loaded up the trailer at 7am and headed down. Stopped at Lowe's and got a door.


Started putting the Wall boards on. It was supopsed to be low humidity and pleasant temperatures, But I got very hot and dehydrated. Worked till about 7pm and then started feeling ill. Woke up with Cramps in the middle of the night a few times.


Installed the windows and hammered the Crap out of my thumb. I found out that when you are bent over and looking though the top of the lenses on Progressive lens, you may miss the nail!


Took alot longer to get everything done than I thought it would..



Decided to leave the trailer down there after unloading it. There is not much floor space right now. I think I have a couple of weekends before I need another load. Starting freeling very ill this morning, so I came home early. Can't wait till it cools off and I can get the roof on...